High Street, Reservoir – Level Crossing Removal Project

The Reservoir level crossing was removed and the construction of a rail bridge over High Street and brand-new Station, including the installation of permanent stairs and lifts at the station, as well as landscaping works around the station precinct. There was also the reinstatement of the bus interchange, car parking and shared use path.

As part of the project, the Vic Gov also building a new public plaza and improving shared use paths for pedestrians and cyclists to create new direct connections between Edwardes Street and Broadway.

CDR provided geotechnical testing throughout both day and night works across the corridor to a number of contractors, including the principal contractor. These works required a number of contractors to work closely together within a high-profile location and to tight deadlines.